|
 |
Rank | Posts | Team |
Moderator | 21388 | No Team Selected |
Joined | Service | Reputation |
Oct 2008 | 16 years | |
Online | Last Post | Last Page |
Mar 2025 | Feb 2025 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
Moderator
|
| So pretty much none of us know anything?
I'm all for people posting opinions or rumours they've heard or even a snippet that they actually know but lets not get too heated over what is happening at WR yet. I'm sure Tesco don't even know yet so even a member of the SMT is unlikely to be able to update us.
Give the likes of RW and his team time to try and either convince Tesco or find someone else. It might turn out for the better.
As someone posted above, Cas are in a pretty good position that they own the ground. Better than many I have to say.
Hope good news comes soon.
|
|
|
Rank | Posts | Team |
Club Coach | 8487 | No Team Selected |
Joined | Service | Reputation |
Jan 2005 | 20 years | |
Online | Last Post | Last Page |
Feb 2020 | Oct 2019 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| The only people who will know are Opus and the higher-ups in Tesco, whilst I'm sure Cas will be kept in the loop when there is news to tell (not forgetting and Legal advisors).
Anyone else not involved in the process will have very limited knowledge and can only go off rumour, hear-say or conjecture as I stated. I'm by no means saying that I am right but I very much doubt that Tesco have pulled out. I actually searched through Tesco's website last night looking for the comments of what I_A was referring to them over-spending. However, at no stage through their Chief Exec's, Chairman's or Financial performance from last season (and notes with the accounts) was this mentioned. If I_A could point me to this, it would be appreciated.
|
|
|
|
Rank | Posts | Team |
Player Coach | 888 | No Team Selected |
Joined | Service | Reputation |
Mar 2008 | 17 years | |
Online | Last Post | Last Page |
Jul 2021 | Mar 2019 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
|
|
|
|
Rank | Posts | Team |
International Star | 360 | No Team Selected |
Joined | Service | Reputation |
Dec 2011 | 13 years | |
Online | Last Post | Last Page |
Aug 2014 | Aug 2014 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| From my understanding Fully Opus are working on a number of sites, site prospecting if you will. They will have to undertake the same studies (if none have been previously done) at all sites. The reason studies into Wheldon Road were done was due to the fact that there were no contemporary studies to cite in any future planning application.
As I said, my understanding is that a number of sites were presented to Tesco by Opus and an additional developer. In the selection process Wheldon Road has been shelved due to flooding, the same information would impact on the Nestle site in exactly the same way. Further investment in flooding & preventative measures within any build would also be required. Hence putting the client off, in this case. These issues are far from being insurmountable but again don't fit with the required timescale from your point of view.
As far as Junction 32 goes, that again isn't set in stone. Castleford will only have until 2014 to make a move or renew the permission. Waystones may choose to go in a different direction, despite having invested in the stadium project how long can they keep a plot waiting? Even if there are signed deals they won't be indefinite.
While I've never believed the projects at Junction 30 and 32 were intrinsically linked I do believe that the first one to get built will be the only one to get built. It's been said to death but contemplate the possibility of sharing.
|
|
|
Rank | Posts | Team |
Club Coach | 8487 | No Team Selected |
Joined | Service | Reputation |
Jan 2005 | 20 years | |
Online | Last Post | Last Page |
Feb 2020 | Oct 2019 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
|
Maybe so but like any other business they're going to have move their money around to different areas.
However, I_A's point was that they've 'overspent' on building stores/acquiring sites. I have seen no evidence of this. Equally, they're hardly going to curb building new stores as the revenue from them will far outweigh the costs.
|
|
Maybe so but like any other business they're going to have move their money around to different areas.
However, I_A's point was that they've 'overspent' on building stores/acquiring sites. I have seen no evidence of this. Equally, they're hardly going to curb building new stores as the revenue from them will far outweigh the costs.
|
|
|
|
|
|
Rank | Posts | Team |
Player Coach | 15521 | No Team Selected |
Joined | Service | Reputation |
Mar 2010 | 15 years | |
Online | Last Post | Last Page |
May 2020 | May 2020 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote TrinitarianWF2="TrinitarianWF2"In the selection process Wheldon Road has been shelved due to flooding'"
If it helps, that ties in with information I posted a couple of weeks ago; the flooding data at WR means that only a store on stilts is viable and a store on stilts costs a significant amount more than a conventional one; that level of cost is not in Tesco's plans.
All rumour and hearsay I suppose, but it's been alluded to a sufficient number of times that it takes on some semblance of verisimilitude.
|
|
|
Rank | Posts | Team |
Club Coach | 8487 | No Team Selected |
Joined | Service | Reputation |
Jan 2005 | 20 years | |
Online | Last Post | Last Page |
Feb 2020 | Oct 2019 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote bren2k="bren2k"
All rumour and hearsay I suppose, but it's been alluded to a sufficient number of times that it takes on some semblance of verisimilitude.'"
Not really. Hearsay takes on a semblance of being hearsay.
|
|
|
Rank | Posts | Team |
International Star | 360 | No Team Selected |
Joined | Service | Reputation |
Dec 2011 | 13 years | |
Online | Last Post | Last Page |
Aug 2014 | Aug 2014 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| I have no axes to grind with Castleford, I enjoy the rivalry and never miss a derby game. I'm not adding to the pathetic swipes that take place online between our "fans", just posting information I have been told is reliable. That's why after a lot of thought I joined, following years of reading.
I completely understand Castleford fans being defensive, cast your mind back to how some people were so convinced Thornes Park was viable, how defensive some of the SWAG lot got when evidence (or lack of it) came to light. Fully is passionately fighting his corner, just as TRB does for Wakefield. No amount of "hear-say" will change his mind, his view point is fixed on Junction 32 and fair play.
I hope another supermarket can be brought in, but at best this only delays something which has a very short window of existence. If either of us miss this deadline it's curtains. Who is to say either of us could maintain full time rugby at our present homes, let alone new ones.
My only concern for Fully is that it will hit him harder than most, as he passionately believes in it.
Thank you very much RFL for this continued state of affairs.
|
|
|
|
Rank | Posts | Team |
Player Coach | 4259 | No Team Selected |
Joined | Service | Reputation |
May 2007 | 18 years | |
Online | Last Post | Last Page |
Jan 2020 | Feb 2019 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote Fully="Fully"Maybe so but like any other business they're going to have move their money around to different areas.
However, I_A's point was that they've 'overspent' on building stores/acquiring sites. I have seen no evidence of this. Equally, they're hardly going to curb building new stores as the revenue from them will far outweigh the costs.'"
Actually I used the term 'over-budget' on their new store development programme for the last two years (in the section of the original post deleted) and not 'overspent' as you are posting I said. There is a very subtle difference in those two statements, so I needed to clarify that for the record.
In answer to your question, Tesco have made clear to all their store development partners that they have indeed exceeded their budgets for the last two years and the reason they told them this, is that they are looking to these partners to value engineer developments as much as possible. I am not sure why you would think you would find this information on their website? While the information of the overspend is not confidential, the actual budget amounts would indeed be reasonably confidential and I bet you can't find any information on any other Tesco departments which have come within or over their budgets for the year either.... why would you?
The point is, every department in Tesco has budgets and budgets are set for many reasons and one of the biggest reasons in Tesco is to continue to deliver a high level of profitability & therefore return for it's shareholders. Tesco is not a bottomless pit and while going maybe tens of millions over budget on store development the last couple of years will not see Tesco unable to 'afford' this, they equally want to keep their costs as low as possible in a difficult global downturn. The point was originally made to demonstrate the fact that now having to a develop a store on stilts, which would cost maybe 25% more, on the WR site, explains why they would look at other options where in previous years speed (which site can be delivered first) would often justify a higher development cost, the focus as changed in recent years to keep development costs as low as possible. Equally, the last Tesco new store development programme I saw didn't include either a Wakefield or Castleford store being delivered in 2012. This programme is fluid and projects get added and projects fall off in the last quarter of the year previous, but generally that programme is the one that matches the budget set!
As for the other sites Tesco are looking at, the information I have is that Tesco have other site options in Castleford they are looking at instead of WR, but I have no idea where exactly those other options are, but a site up near the bus station has been mooted.
The 'industry' is saying WR is no longer in Tesco's plan for a new store, and that is now coming from many different sources, that is as much as I can tell you.
|
|
|
Rank | Posts | Team |
Club Coach | 8487 | No Team Selected |
Joined | Service | Reputation |
Jan 2005 | 20 years | |
Online | Last Post | Last Page |
Feb 2020 | Oct 2019 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| No, I don't believe the hear say because I hear completely differently. It's quite common for Wakefield fans to come on here spouting off about our position without any semblance of fact rather than what they hear on the streets. The majority of it actually turns out to be poppy-cock.
At the end of the day, most of the sites along the River Aire are at risk of Flooding. There is only the town centre that isn't really affected and there are no sites big enough, certainly for the ones like Tesco will be eyeing up, for such a site. They're going to have the same problem everywhere, Hicksons more-so, the Bus Depot (and significantly worse highways problems too), Nestle (which is probably closer to the River Aire). Even Edinburgh House's scheme is probably on the cusp of it but I think it has flood defences down there behind Davison and Robinson.
Anymore, for anymore? In, short, the flood risk will have been sorted a long, long time ago and I'm sure Tescos reassured. Hell, even Opus might foot the costs to sort out the stilts.
|
|
|
Rank | Posts | Team |
Player Coach | 15521 | No Team Selected |
Joined | Service | Reputation |
Mar 2010 | 15 years | |
Online | Last Post | Last Page |
May 2020 | May 2020 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Quote Fully="Fully"Not really. Hearsay takes on a semblance of being hearsay.'"
Quite possibly Fully, but I'm a great believer in the duck test:
Quote Fully="Douglas Adams"If it looks like a duck, and quacks like a duck, we have at least to consider the possibility that we have a small aquatic bird of the family anatidae on our hands.'"
|
|
|
|
Rank | Posts | Team |
International Star | 360 | No Team Selected |
Joined | Service | Reputation |
Dec 2011 | 13 years | |
Online | Last Post | Last Page |
Aug 2014 | Aug 2014 | LINK |
Milestone Posts |
|
Milestone Years |
|
Location |
|
Signature |
TO BE FIXED |
|
| Just be open to the possibility that Wheldon Road may not happen after all these years and investment from several places.
If time wasn't a factor there would be no issue. But we all know that's not the case.
All I'm saying is be fluid in your contemplation and expectations, it's far less likely to hurt if things do fall apart.
Yes I would consider Junction 32, whilst we continued on with our own designs, if the RFL would allow it. Would you do similar if the shoe was on the other foot?
|
|
|
 |
|