Re: And so it begins..... : Fri Jun 01, 2012 5:05 pm
Anakin Skywalker wrote:
Yes I was at CP today and had 2 things confirmed.
1 it is a piling mat and not a damp proof course.
2 as you rightly say it is going to be driven THROUGH by the piles.
I asked what the black membrane was actually for and it is to stop the stones sinking into the soil below so it stays solid for the piling machine.
1 it is a piling mat and not a damp proof course.
2 as you rightly say it is going to be driven THROUGH by the piles.
I asked what the black membrane was actually for and it is to stop the stones sinking into the soil below so it stays solid for the piling machine.
When does the piling start?