Part 2
Moving onto the North stand the blockwork here looks close to completion Only the North Western side of the stand has any scaffolding left up
Turnstyle entrance for the North Stand
Peering into the North stand, you can see through a vomitory were they have concreted from the internal concourse to the pitch side concourse. There looks to be a slope downwards from the pitch side, to the back of the stand.
Disabled toilet can also be seen through the scaffolding
looking up to the north stand roof, Neon lighting tubes can be seen in line with the Vomitories and walkways to them. The green shimmer is the roof reflecting the grass.
Moving onto the west stand we can see the completed blockwork. Note the unusual yellow reflection from the roof.
This pitch shot of the man mowing gives an indication of whats causing the yellow reflection. In the background in front of the West Terrace you can see wooden molds for the concrete concourse. The reflected yellow will be the plastic groundsheet on which the concrete is poured
Huge air con pipes were stacked up outside the Tesco main gate
A shot of Tesco's and the path built for the new footbridge
The view from the footpath to the piling rig
Finally two more shots of the main south stand